Mills Act Information
Resource · Design review in Orange

Planning work on a historic home in Orange?

If your home is in Old Towne or one of Orange’s Eichler tracts, most exterior work goes through the City’s design review. This page explains which review your project needs and what the design standards say, in plain language. You can also ask the helper.

Always contact the City Planning Department before starting work on your home project.Historic Preservation staff: 714-744-7200, 300 E. Chapman Ave. Staff can tell you which review you need, and talking to them first saves time and money.

This is a summary of the City’s published documents, not an official City page. The City of Orange’s Historic Preservation staff makes the final call on every project.

Design review helper
Answers from Orange’s design standards
Always contact the City Planning Department before starting work. Automated answers summarizing City documents.
Step one

Is your home in a historic district?

Design review applies to properties in Orange’s historic districts. Two sets of design standards cover them, one for Old Towne and one for the Eichler tracts.

Historic Preservation Design Standards · adopted Dec. 2018

Old Towne historic districts

Three overlapping districts, together called the Old Towne historic districts:

  • The National Register Plaza Historic District: the four commercial blocks around Plaza Park.
  • The National Register Old Towne Orange Historic District.
  • The local Old Towne Orange Historic District: about a square mile of homes, shops, churches and packing houses around downtown. It includes the Cypress Street Barrio.

Most contributing buildings are bungalows, hip-roof cottages, Craftsman, Victorian and Mediterranean Revival houses, according to the City’s 2010 inventory.

Orange Eichler Design Standards · adopted Nov. 2018

Eichler tracts

Three mid-century tracts built by Joseph Eichler’s company, each an Eichler Tract Overlay Zone:

  • Fairhaven (1960)
  • Fairmeadow (1962)
  • Fairhills (1964)

The standards protect the post-and-beam forms, low rooflines, vertical-groove siding, glass walls and open front yards that define these neighborhoods.

Contributor

Built during the district’s period of significance and still looks the part. Historic garages and outbuildings usually count too. Contributors get the full set of standards, and only contributors can qualify for the Mills Act.

Non-contributor

Built later, or changed so much it no longer reads as historic. It still goes through design review. The standards for non-contributors focus on fitting the street. A house over 40 years old may also be significant in its own right, so check with staff early.

Not sure which you have? Call Historic Preservation staff at 714-744-7200, or check the City’s Historic Preservation page.

Step two

Which review does my project need?

There are three levels. The same table applies to contributors and non-contributors. Staff can send any project up to the Committee if it is complex.

Exempt

No design review

Maintenance with no change in design or materials, repainting already-painted surfaces, interior work, and most planting.

Staff · MDR

Minor Design Review

Filed with the Planning Division. If it’s complete and meets the standards, it can often be approved at the counter. Building permits may still be needed.

Committee · DRC

Design Review Committee

Five appointed professionals at a public meeting. Staff reviews within 30 days, then schedules the meeting. Permits are issued after a 15-day appeal period.

Always contact the City Planning Department before starting work on your home project.This table is a guide only. Staff decide the review level for every project, and some exempt work still needs a building permit. Call 714-744-7200.
ProjectReview

Step three

How to plan a project that gets approved

Both sets of standards recommend the same seven steps.

Always contact the City Planning Department before starting work on your home project.Before you hire a contractor, order materials or remove anything, call Historic Preservation staff at 714-744-7200.
  1. Read the standards that apply

    Find the sections that cover your work: building features, setting, additions or new construction.

  2. Know your house

    List its character-defining features (porch, windows, rafter tails, beam ends, siding) and how the project touches them. Look at how it will fit the street.

  3. Talk to staff first

    The City strongly recommends meeting Historic Preservation staff before final drawings. They can flag conflicts early.

  4. Get professional help

    An architect or designer with preservation (or mid-century) experience isn’t required, but clear drawings save time and money.

  5. Submit a complete application

    Use the Minor Design Review form for staff-level work, or a Design Review application for Committee work. Include a site plan, elevations, photos and product information.

  6. Staff review

    Complete minor projects that meet the standards can be approved at the counter. For Committee projects, staff reviews within 30 days and may ask for changes.

  7. Attend the DRC meeting

    Bring your designer. The Committee can approve, approve with conditions, deny, or continue the item. Its decision can be appealed to the Planning Commission.

The rules

Key design standards by topic

The main points from each document, side by side. In the standards, “shall” is a requirement and “should” is strong guidance. Open a topic to see both districts.

Always contact the City Planning Department before starting work on your home project.These summaries don’t cover every rule. Staff will confirm what applies to your house: 714-744-7200.
Mills Act owners

Design review and your Mills Act contract

A Mills Act contract doesn’t replace design review. The work in your rehabilitation plan still goes through the same review as any other project.

What to keep in mind

  • Contract work should follow the Secretary of the Interior’s Standards and the City’s design standards. Repair comes before replacement.
  • Staff note Mills Act status on minor review applications, so expect a close look at historic materials.
  • Plan bigger items like a re-roof, window restoration or foundation work early. Some need staff review, and changes to rooflines or additions go to the Committee.
  • Keep approvals, permits and before/after photos with your contract records for inspections.
  • The draft ordinance would add homes with active Mills Act contracts to a new Orange Register, if the City already has documentation that they qualify.

How the Mills Act works · Estimate your savings

The Construction Acknowledgment

For some projects, the City asks the owner, contractor and architect to sign a Historic Property Construction Acknowledgment. By signing, you agree to:

  • Keep the character-defining features staff lists for your property.
  • Do only the work described in your approved scope.
  • Stop work immediately and call Historic Preservation staff if the work turns up hidden damage or structural failure, or needs more work than planned.
  • Tell your contractor about these requirements.

If work leads to unpermitted demolition of all or part of the structure, the owner faces civil penalties, and the City may refuse any permit for one year (OMC 17.10.090 E).

What’s changing

Proposed changes to design review

The rules above are in effect today. Two updates are worth knowing about.

New Historic Preservation Ordinance

Approved on first reading on Nov. 10, 2026. Not yet adopted. It returns to City Council for a second reading, tentatively Nov. 24 or Dec. 8 (TBD), and is adopted if approved there. Until then, the current rules on this page apply. The ordinance (Final Administrative Draft v5, Aug. 31, 2026) would replace the Design Review Committee with a new Heritage Commission and sort projects into three tiers:

Tier 1Major alterations: a Certificate of Appropriateness from the Commission at a public hearing. This covers changes to character-defining features, additions of 120 sq ft or more visible from the street, relocation, and new construction in a district.
Tier 2Minor alterations: an administrative Certificate of Appropriateness from staff, for work that doesn’t change character-defining features.
Tier 3Exempt: ordinary maintenance and repair, paint (unless it covers a feature that was never painted), interior work, like-for-like light fixtures, panels, roof sheathing, screens and awnings, equipment not visible from the street, and routine landscaping.

It also adds an optional early conceptual review with preservation staff before you submit.

Read the draft (PDF) · Our ordinance summary

2024 Historic Preservation Objective Design Standards

In September 2024 the City added objective design standards for Old Towne. They are written for certain multifamily and mixed-use housing projects that state housing laws streamline. They turn the 2018 guidance into measurable rules. For example:

  • Replacing intact or repairable historic features is prohibited.
  • Unpainted historic masonry, concrete or wood can’t be painted.
  • Historic properties need an evaluation by a qualified preservation professional.

Most single-family projects still follow the 2018 standards. If you’re planning units, ask staff which set applies.

2024 standards update (PDF)

Who to call

Contacts

Historic Preservation

Community Development Department
300 E. Chapman Ave., Orange, CA 92866
714-744-7200

Trees and landscape plans

Community Services Department handles tree removal permits and landscape inspections.
714-532-6464

Questions for us

Ask the helper. If it can’t answer, it can send your question to the team at Mills Act Orange, and they’ll email you back.

Stay up to date

Email updates on the Mills Act, Orange’s preservation ordinance, City meeting dates and new interviews.

Pick topics (optional)
What would you like to hear about?
Never shared. Unsubscribe anytime. Not affiliated with the City of Orange.